Norvegia: E73 Pipeline over Moa - transfer facility (Kongshaugen)
Data licitatiei 30.01.2025
au mai rămas 7 zile
11
11
Valoare estimata : 0
|
Tip anunt:
UE
|
ID: 9115391
|
Data publicarii :
23.12.2024
|
Tara/Judet:
NO |
Descriere scurta:
Norvegia: E73 Pipeline over Moa - transfer facility (Kongshaugen)
Coduri CPV:
45000000-7 - Lucrări de construcţii
45110000-1 - Lucrări de demolare de clădiri şi de terasament
45230000-8 - Lucrări de construcţii de conducte, de linii de comunicaţii şi electrice, de autostrăzi, de şosele, de aerodromuri şi de căi ferate; lucrări de nivelare
45231300-8 - Lucrări de construcţii de conducte de apă şi de canalizare a apelor reziduale la mare distanţă
45252000-8 - Lucrări de construcţii de staţii de tratare a apelor reziduale, de staţii de epurare şi de staţii de incinerare a deşeurilor menajere
|
Textul licitației
ct mainly comprises the following: Area Breivika – Moa (accompanying drawings/documents marked 493): Pump pipeline wastewater and fibre triggerer - from the connection point at the new pump station PA050 (to be carried out in Contract E22 for the ex RA5 Breivika) to the connection point between OBS Bygg and Felleskjøpet (the pipeline further is carried out by the Norwegian Public Roads Administration in a contract connected to the Bypakken/Lerstad tunnel). Conduit from transformer to connection point at PA040. Area Moa – Borgundfjordvegen (accompanying drawings/documents marked 495): Pipeline for wastewater - from the connection point at the new valve house KA041 (executed in Contract E22 at parking place north of Urnelunden at Moa) to the connection point for the new Ventilhus Borgundfjordvegen KA040. This route also includes: Pipeline for surface water for the route where this is carried in and along Vestmoa and Borgundvegen Ground and auxiliary work with alterations to the district heating route Vestmoa. Crossing the Borgundvegen Longitudinal route of the allé and foot and cycle path Crossing the Minibus roadGravetrase in foot and cycle path that crosses golf course Controlled drilling under the Borgundfjord roadTrekkerør for fibre – from the connection point in the manhole on the south side of B