Irlanda: Multi-Disciplinary Design Team Services for Planned Thermal and Electrical Resilience Upgrade Works at Beaumont Hospital
Data licitatiei 05.08.2024
Expirat
25
25
Valoare estimata : 4,000,000 EUR
|
Tip anunt:
UE
|
ID: 8494748
|
Data publicarii :
11.07.2024
|
Tara/Judet:
IR |
Descriere scurta:
Irlanda: Multi-Disciplinary Design Team Services for Planned Thermal and Electrical Resilience Upgrade Works at Beaumont Hospital
Coduri CPV:
51100000-3 - Servicii de instalare a echipamentului electric şi mecanic
71000000-8 - Servicii de arhitectură, de construcţii, de inginerie şi de inspecţie
71220000-6 - Servicii de proiectare arhitecturală
71311000-1 - Servicii de consultanţă în domeniul lucrărilor publice
71314200-4 - Servicii de gestionare a energiei electrice
71314300-5 - Servicii de consultanţă în eficienţă energetică
71321000-4 - Servicii de proiectare tehnică a instalaţiilor mecanice şi electrice pentru construcţii
71333000-1 - Servicii de inginerie mecanică
71334000-8 - Servicii de inginerie mecanică şi electrică
75251110-4 - Servicii de prevenire a incendiilor
|
Textul licitației
anned thermal and electrical resilience upgrade works at Beaumont Hospital. Beaumont Hospital’s campus is beginning to undergo significant transformation in accordance with the provisions of the Hospital’s Protective Development Control Plan (PDCP). Six large acute facilities projects are due for completion between 2024 and 2030. The combined area of these new facilities is c. 22,350 m², representing a substantial increase to the existing building stock of 88,000 m². In essence, the Hospital’s long-term plan is to migrate its acute services (i.e., Theatre, Diagnostics, etc.), to the under-developed western side of the campus. To facilitate this significant increase in building stock, both the primary and secondary electrical and thermal systems must be upgraded and modernised to meet future demand. With the Irish Government’s Climate Action Plan 2024 heavily focused on sustainability and reductions to emissions, the Hospital is facing a significant task in order to meet its targets. The appointed design team will provide a fully HTM compliant N+1 resilience secondary electrical power supply, SPS (the primary supply upgrade is already underway), and a heat pump district heating (DH) system. As explained in greater detail throughout this document, the appointed design team shall progress the project in accordance with th