Irlanda: MECHANICAL and ELECTRICAL Reserved Specialists - Redevelopment of Loreto Rathfarnham Primary School
Data licitatiei 23.09.2024
Expirat
19
19
Valoare estimata : 2,800,000 EUR
|
Tip anunt:
UE
|
ID: 8620049
|
Data publicarii :
13.08.2024
|
Tara/Judet:
IR |
Descriere scurta:
Irlanda: MECHANICAL and ELECTRICAL Reserved Specialists - Redevelopment of Loreto Rathfarnham Primary School
Coduri CPV:
45310000-3 - Lucrări de instalaţii electrice
45311000-0 - Lucrări de cablare şi conexiuni electrice
45311100-1 - Lucrări de cablare electrică
45311200-2 - Lucrări de conexiuni electrice
45315000-8 - Lucrări de instalare de echipamente de încălzire şi de alte echipamente electrice pentru clădiri
45315100-9 - Instalaţii electrotehnice
45317000-2 - Alte lucrări de instalare electrică
45350000-5 - Instalaţii mecanice
45351000-2 - Lucrări de instalare de inginerie mecanică
51100000-3 - Servicii de instalare a echipamentului electric şi mecanic
51110000-6 - Servicii de instalare a echipamentului electric
51120000-9 - Servicii de instalare de echipament mecanic
|
Textul licitației
nd install Temporary Accommodation; including site preparation, groundworks and services based on general compliance with the Design Intent as enshrined in the drawings and performance specifications included in the tender pack in relation to Temporary Accommodation (2 stories, 21 classrooms, 4 learning support rooms, offices and ancillary accommodation, provision of lift access to upper floor, compliance with BReg TGD PartL in terms of thermal envelope and heating method, access decking and site paths and guardings, inter alia); any regularisation in relation to the statutory grants of Planning Permission, Disabled Access Certificate and Fire Safety Certificate as granted in relation to the notional Design Intent for the Temporary Accommodation. It is envisaged that within 6 months of award of contract, the contractor will handover the completed Temporary Accommodation for occupation and use by the Loreto National school, to enable the school vacate the existing buildings and commence teaching and learning within the Temporary Accommodation for the duration of the follow-on Works Requirements phases. The contractor shall be responsible for the removal of the Temporary Accommodation off site after the school decants into the Main Building and linked refurbishment of Granite Building when complete and ready for use by the school,