Data licitatiei 30.04.2025

au mai rămas 90 zile

Construction of the wastewater treatment plant, wastewater collection system and implementation of water supply priority measures in the Municipality of Kolašin
Data licitatiei 30.04.2025
au mai rămas 90 zile
2
2
Valoare estimata : 0 Tip anunt: UE ID: 9206831 Data publicarii : 30.01.2025 Tara/Judet: AL
Descriere scurta:

Construction of the wastewater treatment plant, wastewater collection system and implementation of water supply priority measures in the Municipality of Kolašin

Coduri CPV:

45240000-1 - Lucrări de construcţii de lucrări hidraulice

Textul licitației

ction of sewerage network in the approximate length of 9.2 km. 2. Water supply priority measures: Water supply priority measures include services, supplies and construction works to be designed, supplied, installed and constructed by the Contractor. 3. Wastewater Treatment Plant Design and Construction of WWTP in Bakovići settlement - Conventional Activated Sludge Process and aerobic sludge stabilization. Design and construction of the WWTP shall include two phases: › Phase I – 4000 PE (to be constructed) › Phase II – additional 2000 PE (to be considered in design) Works will be implemented according to FIDIC Yellow Book (1999 ed), in compliance with requirements of the Montenegrin legislation and relevant EU and EIB requirements. The Contractor must particularly consider licensing and permits requirements in the Law on Spatial Planning and Construction of Structures in Montenegro in force.Identificatorul procedurii: 01053f21-b48d-42aa-9f2d-d65ab528b44fIdentificator intern: EIB-GtP/ENR/10 711_Kolasin_WorksTip de procedură: DeschisăProcedura este accelerată: nuPrincipalele caracteristici ale procedurii: The indicative scope of works covers the following elements: 1. Sewerage network: Construction of sewerage network in the approximate length of 9.2 km wh

Pentru a vedea textul integral al licitaţiei trebuie să aveți cont și abonament.

autentificare CREARE CONT Cere Consultanta